DAY CLOSURES MONDAY 01/05/2009 [8 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/05 08:01
Paving 01/06 05:01
39 EB/WB #1 3 RTE 72 LT / RTE 39 RT TRN - WHITTIER BLV AT HARBOR 01/05 09:01
Street Rehab 01/05 15:45
39 NB/SB #1 3 LINCOLN AVE - JCT 72/VIA WHITTIER BLV 01/05 09:01
Street Rehab 01/05 15:45
39 NB/SB #1 3 RTE 72 LT / RTE 39 RT TRN - JCT 72/VIA WHITTIER BLV 01/05 09:01
Street Rehab 01/05 15:45
261 NB #2 2 BEGIN RTE AT WALNUT OC - JCT RTE 241 01/05 07:01
Striping / Marking 01/05 15:01
261 SB #2 2 JCT RTE 241 - BEGIN RTE AT WALNUT OC 01/05 09:01
Striping / Marking 01/05 16:01


NIGHT CLOSURES MONDAY 01/05/2009 [24 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/05 20:01
Paving 01/06 05:01
5 NB #4 4 END BR 55-227 - JCT 74 / 5 SEP 55-229 01/05 22:01
Striping / Marking 01/06 04:01
5 NB #1 1 NB OFF TO BEACH / MNCHTR - NB OFF TO BEACH / MNCHTR 01/05 23:01
K-Rail 01/06 05:01
5 NB #3, #4 4 END BR 55-227 - JCT 74 / 5 SEP 55-229 01/05 23:01
Striping / Marking 01/06 04:01
5 NB #2, #3, #4 4 END BR 55-227 - JCT 74 / 5 SEP 55-229 01/05 23:45
Striping / Marking 01/06 03:01
5 NB #1, #2, #3 3 JCT 91 / 5 SEP OH 55-502R - ARTESIA AVE UC 55-139 01/05 23:30
Striping / Marking 01/06 04:01
5 NB #1 1 NB ON FR ORANGETHORPE AV - NB ON FR ORANGETHORPE AV 01/05 23:01
Electrical Repair 01/06 05:01
5 NB #1, #2, Left HOV 5 BROOKHURST ST OC 55-89R - JCT 91 / 5 SEP OH 55-293L 01/05 22:01
Bridge Work 01/06 05:01
5 NB #1, #2 2 NB ON CAMINO CAPISTRANO - NB ON CAMINO CAPISTRANO 01/05 22:01
Striping / Marking 01/06 04:01
5 SB #5 4 JCT 74 / 5 SEP 55-229 - END BR 55-227 01/05 22:01
Striping / Marking 01/06 04:01
5 SB #2, #3, #4 4 JCT 74 / 5 SEP 55-229 - END BR 55-227 01/05 23:45
Striping / Marking 01/06 03:01
5 SB #1, #2, #3 3 SB OFF SAN JUAN CREEK RD - SB OFF SAN JUAN CREEK RD 01/05 22:01
Striping / Marking 01/06 04:01
5 SB #1, #2 2 SB ON ARTESIA AVE - SB ON ARTESIA AVE 01/05 23:01
K-Rail 01/06 05:01
5 SB #1, #2, #3 3 SB ON ARTESIA AVE - JCT 39 / 5 SEP 55-161 01/06 00:01
Bridge Work 01/06 04:01
5 SB #2, #3 3 END BR 55-139 - JCT 91 / 5 SEP OH 55-293L 01/05 23:01
K-Rail 01/06 00:01
5 SB #3, #4 4 JCT 74 / 5 SEP 55-229 - END BR 55-227 01/05 23:01
Striping / Marking 01/06 04:01
57 NB #1 1 NB OFF ORANGETHORPE AVE - NB OFF ORANGETHORPE AVE 01/05 22:30
Cracksealing 01/06 04:30
57 NB #4 5 NB OFF TO WB RTE 91 - ORANGETHORPE UC 55-459 01/05 22:30
Cracksealing 01/06 04:30
57 SB #1, #2 2 END BR 55-492 - SB ON LAMBERT RD 01/05 21:01
Erosion Repair 01/06 05:01
57 SB #1, #2 2 NB OFF LAMBERT RD - END BR 55-492 01/05 21:01
Erosion Repair 01/06 05:01
57 SB #1, #2 2 END BR 55-492 - SB ON LAMBERT RD 01/05 21:01
Erosion Repair 01/06 05:01
91 EB #1 1 EB CONNECTOR TO RTE 57 - EB CONNECTOR TO RTE 57 01/05 22:01
Cracksealing 01/06 05:01
91 EB #1 1 WB CONNECTOR TO RTE 57 - WB CONNECTOR TO RTE 57 01/05 22:01
Cracksealing 01/06 05:01
91 WB #1, #2 2 WB 91 CONNECTOR TO NB RTE 5 - WB 91 CONNECTOR TO NB RTE 5 01/05 23:01
Bridge Work 01/06 04:01


DAY CLOSURES TUESDAY 01/06/2009 [10 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/06 08:01
Paving 01/07 05:01
1 NB #2 2 EL MORO ELEM.SCH RT OID - CRYSTAL COVE (PRIVATE) 01/06 09:01
Electrical Repair 01/06 15:01
39 EB/WB #1 3 RTE 72 LT / RTE 39 RT TRN - WHITTIER BLV AT HARBOR 01/06 09:01
Street Rehab 01/06 15:45
39 NB/SB #1 3 LINCOLN AVE - JCT 72/VIA WHITTIER BLV 01/06 09:01
Street Rehab 01/06 15:45
39 NB/SB #1 3 RTE 72 LT / RTE 39 RT TRN - JCT 72/VIA WHITTIER BLV 01/06 09:01
Street Rehab 01/06 15:45
90 EB #1 3 JCT39(BEACH BL);VIA IMP - JCT39(BEACH BL);VIA IMP 01/06 09:01
Survey 01/06 15:01
90 WB #3 3 ROSE DR - CARBON CAN CR CUL 55-84 01/06 09:01
Other check Remarks 01/06 15:01
261 NB #2 2 BEGIN RTE AT WALNUT OC - JCT RTE 241 01/06 07:01
Striping / Marking 01/06 15:01
261 SB #2 2 JCT RTE 241 - BEGIN RTE AT WALNUT OC 01/06 09:01
Striping / Marking 01/06 16:01


NIGHT CLOSURES TUESDAY 01/06/2009 [16 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/06 20:01
Paving 01/07 05:01
5 NB #1 1 NB OFF TO BEACH / MNCHTR - NB OFF TO BEACH / MNCHTR 01/06 23:01
K-Rail 01/07 05:01
5 NB #1, #2, #3 3 JCT 91 / 5 SEP OH 55-502R - ARTESIA AVE UC 55-139 01/06 23:30
Striping / Marking 01/07 04:01
5 NB #1, #2, Left HOV 5 BROOKHURST ST OC 55-89R - JCT 91 / 5 SEP OH 55-293L 01/06 22:01
Bridge Work 01/07 05:01
5 NB #1 1 NB ON FR ORANGETHORPE AV - NB ON FR ORANGETHORPE AV 01/06 23:01
Electrical Repair 01/07 05:01
5 SB #2, #3 3 END BR 55-139 - JCT 91 / 5 SEP OH 55-293L 01/06 23:01
K-Rail 01/07 00:01
5 SB #1, #2, #3 3 SB ON ARTESIA AVE - JCT 39 / 5 SEP 55-161 01/07 00:01
Bridge Work 01/07 04:01
5 SB #1, #2 2 SB ON ARTESIA AVE - SB ON ARTESIA AVE 01/06 23:01
K-Rail 01/07 05:01
57 SB #1, #2 2 END BR 55-492 - SB ON LAMBERT RD 01/06 21:01
Erosion Repair 01/07 05:01
57 SB #1, #2 2 END BR 55-492 - SB ON LAMBERT RD 01/06 21:01
Erosion Repair 01/07 05:01
57 SB #1, #2 2 NB OFF LAMBERT RD - END BR 55-492 01/06 21:01
Erosion Repair 01/07 05:01
57 SB #1, #2 2 END BR 55-492 - SB ON LAMBERT RD 01/06 21:01
Erosion Repair 01/07 05:01
91 EB #4 4 EB OFF RAMP TO ST COLLEGE BL - JCT ST 57 01/06 22:30
Cracksealing 01/07 04:30
91 SB #1 1 EB ON RAMP FR ST COLLEGE BL - EB ON RAMP FR ST COLLEGE BL 01/06 22:30
Cracksealing 01/07 04:30
91 SB #1, #2 2 EB CONNECTOR TO RTE 57 - EB CONNECTOR TO RTE 57 01/06 22:30
Cracksealing 01/07 04:30
91 WB #1, #2 2 WB 91 CONNECTOR TO NB RTE 5 - WB 91 CONNECTOR TO NB RTE 5 01/06 23:01
Bridge Work 01/07 04:01


DAY CLOSURES WEDNESDAY 01/07/2009 [7 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/07 08:01
Paving 01/08 05:01
5 WB #1, #2, #3 3 SB ON FR AV VISTA HERMOS W/B Ave V Hermosa - SB ON FR AV VISTA HERMOS N/B to S/B I-5 On-ramp 01/07 09:01
Grinding 01/07 15:01
39 EB/WB #1 3 RTE 72 LT / RTE 39 RT TRN - WHITTIER BLV AT HARBOR 01/07 09:01
Street Rehab 01/07 15:45
39 NB/SB #1 3 RTE 72 LT / RTE 39 RT TRN - JCT 72/VIA WHITTIER BLV 01/07 09:01
Street Rehab 01/07 15:45
39 NB/SB #1 3 LINCOLN AVE - JCT 72/VIA WHITTIER BLV 01/07 09:01
Street Rehab 01/07 15:45
261 NB #2 2 BEGIN RTE AT WALNUT OC - JCT RTE 241 01/07 07:01
Striping / Marking 01/07 15:01
261 SB #2 2 JCT RTE 241 - BEGIN RTE AT WALNUT OC 01/07 09:01
Striping / Marking 01/07 16:01


NIGHT CLOSURES WEDNESDAY 01/07/2009 [12 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/07 20:01
Paving 01/08 05:01
5 NB #1, #2, #3 3 JCT 91 / 5 SEP OH 55-502R - ARTESIA AVE UC 55-139 01/07 23:30
Striping / Marking 01/08 04:01
5 NB #1 1 NB OFF TO BEACH / MNCHTR - NB OFF TO BEACH / MNCHTR 01/07 23:01
K-Rail 01/08 05:01
5 NB #1, #2, Left HOV 5 BROOKHURST ST OC 55-89R - JCT 91 / 5 SEP OH 55-293L 01/07 22:01
Bridge Work 01/08 05:01
5 SB #1, #2, #3 3 SB ON ARTESIA AVE - JCT 39 / 5 SEP 55-161 01/08 00:01
Bridge Work 01/08 04:01
5 SB #1, #2 2 SB ON ARTESIA AVE - SB ON ARTESIA AVE 01/07 23:01
K-Rail 01/08 05:01
5 SB #2, #3 3 END BR 55-139 - JCT 91 / 5 SEP OH 55-293L 01/07 23:01
K-Rail 01/08 00:01
57 SB #1, #2 2 NB OFF LAMBERT RD - END BR 55-492 01/07 21:01
Erosion Repair 01/08 05:01
57 SB #1, #2 2 END BR 55-492 - SB ON LAMBERT RD 01/07 21:01
Erosion Repair 01/08 05:01
57 SB #1, #2 2 END BR 55-492 - SB ON LAMBERT RD 01/07 21:01
Erosion Repair 01/08 05:01
57 SB #1, #2 2 END BR 55-492 - SB ON LAMBERT RD 01/07 21:01
Erosion Repair 01/08 05:01
91 WB #1, #2 2 WB 91 CONNECTOR TO NB RTE 5 - WB 91 CONNECTOR TO NB RTE 5 01/07 23:01
Bridge Work 01/08 04:01


DAY CLOSURES THURSDAY 01/08/2009 [8 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/08 08:01
Paving 01/09 05:01
5 NB #1, #2 2 NB ON ECR/AVE MENDOCINO - NB ON ECR/AVE MENDOCINO 01/08 10:01
landscaping 01/08 14:01
5 WB #1, #2, #3 3 SB ON FR AV VISTA HERMOS W/B Ave V Hermosa - SB ON FR AV VISTA HERMOS N/B to S/B I-5 On-ramp 01/08 09:01
Grinding 01/08 15:01
39 EB/WB #1 3 RTE 72 LT / RTE 39 RT TRN - WHITTIER BLV AT HARBOR 01/08 09:01
Street Rehab 01/08 15:45
39 NB/SB #1 3 LINCOLN AVE - JCT 72/VIA WHITTIER BLV 01/08 09:01
Street Rehab 01/08 15:45
39 NB/SB #1 3 RTE 72 LT / RTE 39 RT TRN - JCT 72/VIA WHITTIER BLV 01/08 09:01
Street Rehab 01/08 15:45
261 NB #2 2 BEGIN RTE AT WALNUT OC - JCT RTE 241 01/08 07:01
Striping / Marking 01/08 15:01
261 SB #2 2 JCT RTE 241 - BEGIN RTE AT WALNUT OC 01/08 09:01
Striping / Marking 01/08 16:01


NIGHT CLOSURES THURSDAY 01/08/2009 [12 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/08 20:01
Paving 01/09 05:01
5 NB #1 1 NB OFF TO BEACH / MNCHTR - NB OFF TO BEACH / MNCHTR 01/08 23:01
K-Rail 01/09 05:01
5 NB #1, #2, #3 3 JCT 91 / 5 SEP OH 55-502R - ARTESIA AVE UC 55-139 01/08 23:30
Striping / Marking 01/09 04:01
5 NB #1, #2, Left HOV 5 BROOKHURST ST OC 55-89R - JCT 91 / 5 SEP OH 55-293L 01/08 22:01
Bridge Work 01/09 06:01
5 NB #1 1 NB ON FR ORANGETHORPE AV - NB ON FR ORANGETHORPE AV 01/08 23:01
Electrical Repair 01/09 05:01
5 SB #1, #2, #3 3 SB ON ARTESIA AVE - JCT 39 / 5 SEP 55-161 01/09 00:01
Bridge Work 01/09 04:01
5 SB #1, #2 2 SB ON ARTESIA AVE - SB ON ARTESIA AVE 01/08 23:01
K-Rail 01/09 05:01
5 SB #2, #3 3 END BR 55-139 - JCT 91 / 5 SEP OH 55-293L 01/08 23:01
K-Rail 01/09 00:01
57 SB #1, #2 2 END BR 55-492 - SB ON LAMBERT RD 01/08 21:01
Erosion Repair 01/09 05:01
57 SB #1, #2 2 NB OFF LAMBERT RD - END BR 55-492 01/08 21:01
Erosion Repair 01/09 05:01
57 SB #1, #2 2 END BR 55-492 - SB ON LAMBERT RD 01/08 21:01
Erosion Repair 01/09 05:01
91 WB #1, #2 2 WB 91 CONNECTOR TO NB RTE 5 - WB 91 CONNECTOR TO NB RTE 5 01/08 23:01
Bridge Work 01/09 04:01


DAY CLOSURES FRIDAY 01/09/2009 [8 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/09 08:01
Paving 01/10 05:01
5 NB #1, #2 2 NB ON ECR/AVE MENDOCINO - NB ON ECR/AVE MENDOCINO 01/09 10:01
landscaping 01/09 14:01
5 WB #1, #2, #3 3 SB ON FR AV VISTA HERMOS W/B Ave V Hermosa - SB ON FR AV VISTA HERMOS N/B to S/B I-5 On-ramp 01/09 09:01
Grinding 01/09 15:01
39 EB/WB #1 3 RTE 72 LT / RTE 39 RT TRN - WHITTIER BLV AT HARBOR 01/09 09:01
Street Rehab 01/09 15:45
39 NB/SB #1 3 LINCOLN AVE - JCT 72/VIA WHITTIER BLV 01/09 09:01
Street Rehab 01/09 15:45
39 NB/SB #1 3 RTE 72 LT / RTE 39 RT TRN - JCT 72/VIA WHITTIER BLV 01/09 09:01
Street Rehab 01/09 15:45
261 NB #2 2 BEGIN RTE AT WALNUT OC - JCT RTE 241 01/09 07:01
Striping / Marking 01/09 15:01
261 SB #2 2 JCT RTE 241 - BEGIN RTE AT WALNUT OC 01/09 09:01
Striping / Marking 01/09 16:01


NIGHT CLOSURES FRIDAY 01/09/2009 [12 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/09 20:01
Paving 01/10 05:01
5 NB #1, #2, #3 3 JCT 91 / 5 SEP OH 55-502R - ARTESIA AVE UC 55-139 01/09 23:30
Striping / Marking 01/10 04:01
5 NB #1 1 NB ON FR ORANGETHORPE AV - NB ON FR ORANGETHORPE AV 01/09 23:01
Electrical Repair 01/10 05:01
5 NB #1, #2, Left HOV 5 BROOKHURST ST OC 55-89R - JCT 91 / 5 SEP OH 55-293L 01/09 22:01
Bridge Work 01/10 06:01
5 NB #1 1 NB OFF TO BEACH / MNCHTR - NB OFF TO BEACH / MNCHTR 01/09 23:01
K-Rail 01/10 05:01
5 SB #1, #2, #3 3 SB ON ARTESIA AVE - JCT 39 / 5 SEP 55-161 01/10 00:01
Bridge Work 01/10 05:01
5 SB #2, #3 3 END BR 55-139 - JCT 91 / 5 SEP OH 55-293L 01/09 23:01
K-Rail 01/10 00:01
5 SB #1, #2 2 SB ON ARTESIA AVE - SB ON ARTESIA AVE 01/09 23:01
K-Rail 01/10 05:01
57 SB #1, #2 2 END BR 55-492 - SB ON LAMBERT RD 01/09 21:01
Erosion Repair 01/10 05:01
57 SB #1, #2 2 END BR 55-492 - SB ON LAMBERT RD 01/09 21:01
Erosion Repair 01/10 05:01
57 SB #1, #2 2 NB OFF LAMBERT RD - END BR 55-492 01/09 21:01
Erosion Repair 01/10 05:01
91 WB #1, #2 2 WB 91 CONNECTOR TO NB RTE 5 - WB 91 CONNECTOR TO NB RTE 5 01/09 23:01
Bridge Work 01/10 04:01


DAY CLOSURES SATURDAY 01/10/2009 [4 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/10 08:01
Paving 01/11 05:01
39 EB/WB #1 3 RTE 72 LT / RTE 39 RT TRN - WHITTIER BLV AT HARBOR 01/10 09:01
Street Rehab 01/10 15:45
39 NB/SB #1 3 LINCOLN AVE - JCT 72/VIA WHITTIER BLV 01/10 09:01
Street Rehab 01/10 15:45
39 NB/SB #1 3 RTE 72 LT / RTE 39 RT TRN - JCT 72/VIA WHITTIER BLV 01/10 09:01
Street Rehab 01/10 15:45


NIGHT CLOSURES SATURDAY 01/10/2009 [9 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/10 20:01
Paving 01/11 05:01
5 NB #1, #2, Left HOV 5 BROOKHURST ST OC 55-89R - JCT 91 / 5 SEP OH 55-293L 01/10 22:01
Bridge Work 01/11 09:30
5 NB #1, #2, #3 3 JCT 91 / 5 SEP OH 55-502R - ARTESIA AVE UC 55-139 01/10 23:01
Striping / Marking 01/11 09:30
5 NB #1 1 NB OFF TO BEACH / MNCHTR - NB OFF TO BEACH / MNCHTR 01/10 23:01
K-Rail 01/11 09:30
5 NB #1 1 NB ON FR ORANGETHORPE AV - NB ON FR ORANGETHORPE AV 01/10 23:01
Electrical Repair 01/11 09:30
5 SB #1, #2, #3 3 SB ON ARTESIA AVE - JCT 39 / 5 SEP 55-161 01/10 23:01
Bridge Work 01/11 09:30
5 SB #2, #3 3 END BR 55-139 - JCT 91 / 5 SEP OH 55-293L 01/10 22:01
K-Rail 01/10 23:01
5 SB #1, #2 2 SB ON ARTESIA AVE - SB ON ARTESIA AVE 01/10 23:01
K-Rail 01/11 09:30
91 WB #1, #2 2 WB 91 CONNECTOR TO NB RTE 5 - WB 91 CONNECTOR TO NB RTE 5 01/10 23:01
Bridge Work 01/11 09:30


DAY CLOSURES SUNDAY 01/11/2009 [4 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
1 NB #2 2 NB OFF TO DOHENY PK RD - DEL OBISPO ST 01/11 08:01
Paving 01/12 05:01
39 EB/WB #1 3 RTE 72 LT / RTE 39 RT TRN - WHITTIER BLV AT HARBOR 01/11 09:01
Street Rehab 01/11 15:45
39 NB/SB #1 3 LINCOLN AVE - JCT 72/VIA WHITTIER BLV 01/11 09:01
Street Rehab 01/11 15:45
39 NB/SB #1 3 RTE 72 LT / RTE 39 RT TRN - JCT 72/VIA WHITTIER BLV 01/11 09:01
Street Rehab 01/11 15:45


NIGHT CLOSURES SUNDAY 01/11/2009 [1 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period


Continuous Closures [ 9 Closures Found]
Rte Dir Lanes
Closed
Total
Lanes
Begin - End Location/
Type of Work
Closure
Period
5 SB #1, #2 2 SB ON ARTESIA AVE - SB ON ARTESIA AVE 07/31 05:01
Bridge Work 07/31 05:01
74 EB/WB #1 2 LAZY W RANCH RD-LT - END OF COUNTY 02/20 04:30
Other check Remarks 12/26 20:30
74 EB/WB #1 2 LAZY W RANCH RD-LT - END OF COUNTY 02/20 04:30
Other check Remarks 12/26 20:30
74 N/A #1 2 LAZY W RANCH RD-LT - END OF COUNTY 02/20 04:30
Other check Remarks 12/26 20:30
74 EB/WB #1 2 LAZY W RANCH RD-LT - END OF COUNTY 02/20 20:30
Other check Remarks 12/26 04:30
74 N/A #1 2 LAZY W RANCH RD-LT - END OF COUNTY 02/20 04:30
Other check Remarks 12/26 20:30
39 NB #1, #2 2 9TH ST-LT;OID - MANCHESTER AVE 01/04 22:01
Paving 01/26 05:01
39 SB #1, #2 2 MANCHESTER AVE - 9TH ST-LT;OID 01/04 22:01
Paving 01/26 05:01
5 SB #1 1 SB ON FR BEACH BLVD - SB ON FR BEACH BLVD 01/04 23:01
K-Rail 09/30 05:01