Welcome to the State of California
Governor SchwarzeneggerGovernor SchwarzeneggerGovernor Schwarzenegger

Environmental Documents

Environmental Planning

The Division of Environmental Planning administers Caltrans' responsibilities under federal and state law in response to the enactment of the National Environmental Policy Act (NEPA) of 1969 and the California Environmental Quality Act (CEQ ) of 1973. In response to the passage of a host of environmentally related laws and regulations, plus heightened public support for the environment, our environmental responsibilities have grown to become a substantive and inseparable part of Caltrans' planning development, construction, operation and maintenance efforts.
 
2009-06-25 State Route-39 Rehabilitation/Reopening Project (Final Environmental Impact Report/Environmental Assessment)
2009-05-01 Schuyler Heim Bridge Replacement and SR-47 Expressway Project (286mb) (Final Environmental Impact Statement/Environmental Impact Report and Section 4(f) Evaluatio)   |  Appendices (102mb)   |  EIS EIR Summary (357k)   |  Notice Of Availability (128k)
2009-05-01 6th Street Viaduct Seismic Improvement Project (Draft Environmental Impact Report/Environmental Impact Statement and Section 4(f) Evaluation)
2009-04-01 Los Angeles Avenue Road Widening Moorpark Avenue to Spring Road (Supplemental Initial Study/Environmental Assessment)
2009-04-01 Interstate Routes 10/605 Direct Connector Project (Mitigated Negative Declaration/Finding of No Significant Impact)
2009-04-01 State Route 2 Freeway Terminus Improvement Project (Initial Study/Environmental Assessment (13mb))
2009-04-01 Avenue I at State Route 14 Interchange Improvements (Initial Study - Proposed Mitigated Negative Declaration)
2009-04-01 State Route 2 Freeway Terminus Improvement Project (Technical Studies (126mb))
2009-03-26 I-405/Avalon Boulevard Interchange (Initial Studv/Environmental Assessment with Negative Declaration and Finding of No Significant Impact)
2009-03-01 State Route 39 North Fork San Gabriel River Bridge Scour Mitigation Project (Initial Study/Environmental Assessment)
2009-01-23 State Route-39 Rehabilitation/Reopening Project (Draft Environmental Impact Report/Environmental Assessment)
2008-12-02 Interstate 405 at Wilmington Avenue Improvement Project (Initial Study/Environmental Assessment with Mitigated Negative Declaration and Finding of No Significant Impact)
2008-12-01 VENTURA / SANTA BARBARA 101 HOV PROJECT (Mitigated Negative Declaration/with Finding of No Significant Impacts)
2008-12-01 I-5 HOV/Truck Lanes Project SR-14 to Parker Road (Draft Environmental Impact Report/Environmental Assessment)
2008-11-01 Schuyler Heim Bridge Replacement and SR-47 Expressway Project (Supplemental Draft Environmental Impact Statement/Recirculated Draft Environmental Impact Report and Section 4(f) Evaluation)
2008-10-01 Interstate Route 10/605 Direct Connector Project (Initial Study/Environmental Assessment)
2008-08-06 VENTURA / SANTA BARBARA 101 HOV PROJECT - From Mobile Pier Road to Casitas Pass Road Ventura County and Santa Barbara County (INITIAL STUDY with Proposed Mitigated Negative Declaration/ENVIRONMENTAL ASSESSMENT)
2008-07-14 SOUTHBOUND INTERSTATE-405 (SAN DIEGO FREEWAY) TO THE U.S. HIGHWAY-101 (VENTURA FREEWAY) CONNECTOR IMPROVEMENT PROJECT (ENVIRONMENTAL ASSESSMENT / INITIAL STUDY [EA/IS] - Finding of No Significant Impact / Mitigated Negative Declaration and Final Section 4(f) Evaluation)
2008-07-08 I-405 / Avalon Boulevard Interchange (Initial Study/Environmental Assessment)
2008-04-17 Los Angeles Avenue Road Widening Moorpark Avenue to Spring Road (Initial Study/Environmental Assessment)
2008-04-11 SOUTHBOUND INTERSTATE-405 (SAN DIEGO FREEWAY) TO THE U.S. HIGHWAY-101 (VENTURA FREEWAY) CONNECTOR IMPROVEMENT PROJECT (DRAFT ENVIRONMENTAL ASSESSMENT/INITIAL STUDY (EA/IS) and SECTION 4(f) EVALUATION)
2008-03-27 Interstate 405 at Wilmington Avenue Improvement Project (Initial Study / Environmental Assessment)
2008-03-01 Golden Valley Road Bridge Draft Environmental Assessment (Draft Environmental Assessment)
2008-02-20 INTERSTATE 405 Sepulveda Pass Widening Project (Final Environmental Impact Report/Environmental Impact Statement and Section 4(f) Evaluation)
2008-01-01 State Route 60 / Lemon Avenue Interchange (Initial Study/Environmental Assessment (And Section 4(F) Evaluation))
2007-08-17 Schuyler Heim Bridge Replacement and SR-47 Expressway Project (w/o Appendices) 33mb (Draft Environmental Impact Statement/Environmental Impact Report and Section 4(f) Evaluation)   |  Appendices (50mb)   |  Full Document Summary (5mb)
2007-08-01 U.S. 101/DEL NORTE BOULEVARD INTERCHANGE IMPROVEMENT PROJECT, CITY OF OXNARD, VENTURA COUNTY (19mbs) (Environmental Assessment / Draft Environmental Impact Report)
2007-05-20 INTERSTATE 405 Sepulveda Pass Widening Project (23.5mbs) (Draft Environmental Impact Report/Environmental Impact Statement and Section 4(f) Evaluation)
2005-12-01 Union Station Run-through Tracks Project  (Final EIR/EIS)
2005-06-13 State Route 138 Widening Project From Avenue T to State Route 18 Junction Through the Communities of Littlerock, Pearblossom, Llano and the City of Palmdale (Final Environmental Impact Report/ Environmental Assessment and Section 4(f) Evaluation)
2005-05-01 SR 126/Commerce Center Drive Interchange Project  (Draft Initial Study/Environmental Assessment)
2004-05-01 VENTURA STATE ROUTE WILDLIFE CORRIDOR ASSESSMENT (Final Wildlife Corridor Assessment Report)
2004-02-01 VENTURA STATE ROUTE WILDLIFE CORRIDOR ASSESSMENT (Highway 118 Corridor Study Survey Report)
2004-02-01 US-101/SR-23 Interchange Improvement Project  (Finding Of No Significant Impact / Negative Declaration)
2003-11-01 VENTURA STATE ROUTE WILDLIFE CORRIDOR ASSESSMENT (Highway 118 Corridor Study Survey Report)
2003-08-01 VENTURA STATE ROUTE WILDLIFE CORRIDOR ASSESSMENT (Highway 118 Corridor Study Survey Report)
2003-07-18 Route 57 / Route 60 Weave Improvement Project  (ND/FONSI - IS/EA - Section 4(f) Evaluation)
2003-07-01 VENTURA STATE ROUTE WILDLIFE CORRIDOR ASSESSMENT (Literature Review Paper)
2003-05-01 VENTURA STATE ROUTE WILDLIFE CORRIDOR ASSESSMENT (Highway 118 Corridor Study Survey Report)
2003-03-01 State Route 39 (San Gabriel Canyon) Roadway Rehabilitation Project  (FINAL, ENVIRONMENTAL ASSESMENT / INITIAL STUDY (EA/IS))
2003-01-01 State Route 39 (San Gabriel Canyon) Roadway Rehabilitation Project  (DRAFT, ENVIRONMENTAL ASSESMENT / INITIAL STUDY (EA/IS))
2002-12-01 State Route 1 (Pacific Coast Highway) at State Route 107 (Hawthorne Blvd) Intersection Improvement Project  (Environmental Assessment/Initial Study (EA/IS) and Section 4(f) Evaluation)
2002-12-01 State Route 118 (Ronald Reagan Freeway) Rocky Peak Road Eastbound Off-Ramp and Westbound On-Ramp  (FINDING OF NO SIGNIFICANT IMPACT/MITIGATED NEGATIVE DECLARATION)
2002-07-01 State Route 101 - La Conchita/Mussel Shoals Access Improvement Project  (Mitigated Negative Declaration/Finding of No Significant Impact)
2002-07-01 Interstate 5 / Empire Avenue Interchange, City of Burbank, Los Angeles County  (Initial Study/Environmental Assessment)
2002-04-18 Lewis Road Widening Project- From Ventura Boulevard to Hueneme Road Bridge City of Camarillo, Ventura County, California  (Final Environmental Impact Report/Environmental Assessment (EIR/EA))
2001-12-19 Rice Avenue/U.S. 101 Interchange Project  (Mitigated Negative Declaration/Finding Of No Significant Impact)
2001-12-01 Interstate-5 at Carmenita Road Interchange Improvement Project  (Initial Study/Environmental Assessment - Negative Declaration/Finding of No Significant Impact)
2001-08-15 Ojai - Maintenance yard Rehabilitation  (Mitigation plan Chart)
2001-08-15 Ojai - Maintenance yard Rehabilitation (Final Negative Declaration)
2001-08-01 Proposed Pomona Maintenance Station Project  (Initial Study)
2001-07-09 I-5 / SR126 Interchange Project  (Initial Study/Environmental Assessment)
2001-06-28 U.S. Route 101 / Rice Ave Interchange Project  (Initial Study/Environmental Assessment)
2001-06-20 Ojai - Maintenance yard Rehabilitation (Initial Study/Environmental Assessment)
2000-11-22 I-5 / Hasley Canyon Interchange Project  (DRAFT IS/EA)


Get adobe ReaderAll associated documents are provided in PDF format and can be viewed using Adobe Acrobat PDF Reader or any comparable product used to utilize the PDF format. Adobe Acrobat PDF Reader is a free product available here.

Page Last Modified 05/26/09 09:48
Back Button | Back To Page Top Link